Well the work on refitting Hannah's tub ran into a snag, this morning.. I had to delay my return to NB 'til Thurs morning. I was aiming at finishing this morning, but the refininshed tub (which looks beautiful) had a problem with it's cast iron legs. I had built a hollow box of 2x5 1/4 to support it, but the drain pipe had sunk into the floor, or the the box was too high. I thought it would pull in but no go. So I cancelled my Aeroplan trip, and to get the same rate, I had to delay return until May 1. So I wil have an extra day to resolve the problem, and to polish up the bathtub console that I had built, to hide the pipes.. A rapid skil-saw slice on the heigyht failed to solve the problem, so I may revisit that approach, anyway..
I called Mom, who was disappointed, of course, but I do get an extra day or so of seeing Noémie!
\I like the new cleaner layout.